在隔熱斷橋鋁型材制造中,穿條機(jī)機(jī)由機(jī)體、工作臺(tái)、滑動(dòng)板、氣動(dòng)系統(tǒng)、電控盤、傳動(dòng)滾輪等主要組成部分。那具體操作及使用怎么進(jìn)行呢?下面由有十多年的機(jī)器研發(fā)經(jīng)驗(yàn)的濟(jì)南歌德瑞斯機(jī)械設(shè)備為您帶來穿條機(jī)的相關(guān)知識。
In the manufacturing of insulated broken bridge aluminum profiles, the threading machine is mainly composed of the body, workbench, sliding plate, pneumatic system, electric control panel, transmission roller, and other main components. How to carry out the specific operation and use? Below, Jinan Gede Ruisi Mechanical Equipment, with over ten years of experience in machine research and development, will bring you relevant knowledge of threading machines.
穿條機(jī)的正常操作流程:
The normal operation process of the threading machine:
1、將設(shè)備的電源線接到車間內(nèi)380伏的空氣開關(guān)上,檢查電路接好
1. Connect the power cord of the equipment to the 380V air switch in the workshop and check that the circuit is properly connected
從左邊數(shù),左邊的三根黑色的是380伏火線、左邊第四根黃色的是零線。通電后如果發(fā)現(xiàn)“刀盤上升”是反的,那么要將左邊的三根黑線任意交叉換一下。調(diào)整好電機(jī)的方向。
Counting from the left, the three black wires on the left are 380V live wires, and the fourth yellow wire on the left is the zero wire. If it is found that the "disc rising" is reversed after power on, then the three black wires on the left should be crossed and replaced arbitrarily. Adjust the direction of the motor.
2、調(diào)整和安裝好兩面的托料平臺(tái)。
2. Adjust and install the support platforms on both sides.
3、先放入一根型材,用手調(diào)整該機(jī)頭的左右移動(dòng)手輪,將“導(dǎo)向定位塊”調(diào)整到機(jī)器出條槽口和鋁型材穿條槽口一致;如需要上下調(diào)整則按動(dòng)“刀盤上升”和“刀盤下降”來調(diào)整機(jī)頭的高度。
3. First, place a profile and adjust the left and right hand wheels of the machine head by hand. Adjust the "guide positioning block" to match the machine's output groove and the aluminum profile's threading groove; If it is necessary to adjust up and down, press "cutter head up" and "cutter head down" to adjust the height of the machine head.
4、再放入上面的兩根開好齒的鋁型材,調(diào)整后面托料架子上的“定位板”,頂住鋁型材。
4. Put in the two aluminum profiles with teeth on top, adjust the "positioning plate" on the rear support frame, and support the aluminum profiles.
5、用人工將隔熱條順導(dǎo)向槽口送入鋁型材槽口內(nèi)一點(diǎn)。
5. Manually guide the insulation strip into the groove of the aluminum profile a little bit.
6、踩下設(shè)備上的腳踏開關(guān),齒刀加壓轉(zhuǎn)動(dòng),將隔熱條高速送入鋁型材槽口,穿條完畢后,松開腳踏開關(guān)。
6. Step on the foot switch on the device, pressurize and rotate the toothed blade, and high-speed feed the insulation strip into the aluminum profile groove. After threading, release the foot switch.
7、重復(fù)以上步驟,加工下一根鋁型材。
7. Repeat the above steps to process the next aluminum profile.
本文由穿條機(jī)友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請期待.
This article is dedicated by the threading machine. For more information, please click: http:// Sincere attitude. We will provide you with comprehensive service. We will gradually contribute more relevant knowledge to everyone. Stay tuned